Weldments — Polder Machine Building

Part five matching part one

Jig-stored assemblies cut rework to near zero across 62 sections.

Sections
62
Rework
2 parts
Jigs stored
3 variants

Handrail sections were drifting between batches. Jigs for every variant went into the library, first articles were measured, and rework on the run fell to two bent sections in 62.