Weldments — Polder Machine Building
Part five matching part one
Jig-stored assemblies cut rework to near zero across 62 sections.
- Sections
- 62
- Rework
- 2 parts
- Jigs stored
- 3 variants
Handrail sections were drifting between batches. Jigs for every variant went into the library, first articles were measured, and rework on the run fell to two bent sections in 62.